Contact us

Should you have any suggestion of the consultation, please E-mail to: consultation@git.gov.mo

If you have any comments or suggestion to our website or other related matters concerning the Transportation Infrastructure Office, please contact us through the following ways:

(1) Office Contact No.: (853) 2881 3721 / 2881 3722 / 2881 3730
    Engineering inquiry hotline:(853) 8506 6171 (During non-business hours, please leave a message in our voicemail
    system and we will get back to you.)
    Office hours:
    Monday to Thursday 09:00-13:00 14:30-17:45
    Friday 09:00-13:00 14:30-17:30
(2) Email: info@git.gov.mo
(3) Mail Address: Rua do Dr. Pedro José Lobo, n.º 1-3, Edf. Banco Luso Internacional, 26º andar, Macau
(4) Fax No.: (853) 2881 3260 / 2881 3292
(5) Fill in the form below and press 'Submit' (This form is not applicable to the consultation of LRT Macau)

 

2018.07 - Foundation work are being started at part of Estrada Flor de Lótus 2018.07 - Some large-scale machines entry the Rotunda Flor de Lótus for the preliminary work of the Seac Pai Van Line 2018.07 - Installation of metal armatures of diaphragm wall 2018.07 - Repairing the structual part in the north ramp 2018.07 - Installation of the temporary structure supports on the ground floor 2018.07 - Construction unit is pouring concrete for spiral ramp 2018.07 - Construction unit is inspecting the suitation of power rail on the viaduct at depot 2018.07 - System installation of train wash equipment at depot 2018.07 - The contruction of the depot engine room is in gradual progress 2018.07 - Cable installation of engine room in depot building 2018.07 - Construction unit is inspecting the suitation of power rail on the viaduct at Estrada de Pac On 2018.07 - Construction unit is adjusting the detailed location of the system equipment on the viaduct along Avenida Wai Long 2018.07 - Construction unit is adjusting the system of ticket vending machine in Airport Station 2018.07- Cable installation on the viaduct at Estação do Aeroporto 2018.07 - Construction unit is inspecting the installation of guide rail and power rail on the viaduct at Avenida do Aeroporto 2018.07 - The suitation of the viaduct at Estação Leste do Cotai 2018.07 - Construction unit is inspecting the system installation on the viaduct at Avenida da Nave Desportiva 2018.07 - Construction unit is inspecting the installation of the system on the viaduct at Estação dos Jogos da Ásia Oriental (in front of the East Asian Games Station) 2018.07 - Contruction unit monitors the electricity system on the viaduct at Avenida da Nave Desportiva 2018.07 - Access control gates of Cotai West Stations have been installed 2018.07 - Construction unit is checking the platform screen door at Pai Kok Station 2018.07 - Construction at concourse of the Stadium Station 2018.07 - Construction unit is checking the engine room in Jockey Club Stations 2018.07 - Equipment installation in Ocean Stations engine room has been completed 2018.06 - The construction unit is testing the signaling system in the engine room 2018.07 - The construction unit is monitoring the test conditions of trains in the backup control center 2018.07 - Some trains have been delivered to depot 2018.07 - The construction unit is testing the emergancy system in the carriage 2018.07 - Some trains have been delivered to depot 2018.07 - Dynamic tests will be carried out after the trains are delivered to the depot 2018.06 - Installation of metal armatures of diaphragm wall 2018.06 - The construction of stabling yard platform at depot has been completed 2018.06 - Some trains are parked in the workshop and maintenance area of depot and waiting for the tests 2018.06 - Installation the access control gates in Taipa Ferry Terminal Station 2018.06 - The construction unit is installing cables in the platform of MUST Station 2018.06 - Some trains are parked on the viaduct at Estr. Flor de Lótus 2018.06 - Footbridge at Lotus Checkpoint Station 2018.05 – Access control gates installation in Pai Kok Station is completed 2018.06 - Train is parked on the platform of Pai Kok Station 2018.06 - Train dynamic test at the Stadium Station 2018.06 - The construction unit is testing the platform screen door at night 2018.06 - Construction at platform of the Ocean Station 2018.06 - Traffic lights of trains are being tested at the workshop and maintenance area of depot 2018.05 – The construction unit is checking the platform screen door at Cotai West Station 2018.05 - Decoration works at Stadium Station 2018.04 - The roads in Lotus Checkpoint Station are reinstated 2018.04 - The roads in Lotus Checkpoint Station are reinstated