Terms of use

This website is established and protected by GIT. The copyrights of all the contents (including texts, graphics, sounds, and images) belong to GIT, and are protected by the laws of Macao SAR and international agreements.
These Terms of Use may be amended from time to time. Changes will be posted on this page. Using of this website, including: browsing, downloading, submitting information to, reproducing and redistributing, linking to the website of GIT, etc. after such changes have been posted will constitute your agreement to the modified Terms of Use and all of the changes.

Consent to accept the Terms of Use of this website
When you use any of the services of this website, means you agree to accept the Terms of Use and Privacy of this website.

Redistribution, reproduction and use through website link
Except those from the third parties, any part of the Contents of this website is readily available for non-commercial use. Reproduction and redistribution can be made without written permission from GIT. However, users must state the website of GIT as the source of contents and the date of obtaining the contents. Meanwhile, users must ensure the accuracy of the Contents copied or reproduced. The reproduction should neither be presented as the official edition of the related information, nor the approved document of GIT.
Except those from the third parties, any part of the Contents of this website is readily available for non-commercial use through website link without written permission from GIT. However, the user’s website must state that the website link is connected to the website of GIT.
Regardless of individual or institutions, the website of GIT or its contents should not be used for commercial purpose in any form prior to getting a written permission from the GIT. No matter commercial or non-commercial reproduction, the contents should not be modified, unless a written authorization is provided by GIT.

Use of data
There is a portion of the Contents in the website of GIT published in numbers. Users can use these materials for further calculation and compiling statistics to obtain new figures. If these figures are to be posted, published, or distributed, users have to cite the source and explain the methods of calculation/compiling statistics.

Disclaimer
GIT strives to ensure the accuracy of the Contents of the website. However, no clearly expressed or connoted assurance or commitment is provided for the related contents. All information is provided on an “as is” basis. GIT reserves the rights to delete, stop posting or edit the information of the website of GIT at any time without prior notice. GIT shall not be liable for or compensate for any damage or loss of any kind caused by using the information of the website.

Changes of the terms
The revised Terms of Use will be posted without any prior notice if changes are made. The revising date will be printed in the page

 

 

2018.07 - Foundation work are being started at part of Estrada Flor de Lótus 2018.07 - Some large-scale machines entry the Rotunda Flor de Lótus for the preliminary work of the Seac Pai Van Line 2018.07 - Installation of metal armatures of diaphragm wall 2018.07 - Repairing the structual part in the north ramp 2018.07 - Installation of the temporary structure supports on the ground floor 2018.07 - Construction unit is pouring concrete for spiral ramp 2018.07 - Construction unit is inspecting the suitation of power rail on the viaduct at depot 2018.07 - System installation of train wash equipment at depot 2018.07 - The contruction of the depot engine room is in gradual progress 2018.07 - Cable installation of engine room in depot building 2018.07 - Construction unit is inspecting the suitation of power rail on the viaduct at Estrada de Pac On 2018.07 - Construction unit is adjusting the detailed location of the system equipment on the viaduct along Avenida Wai Long 2018.07 - Construction unit is adjusting the system of ticket vending machine in Airport Station 2018.07- Cable installation on the viaduct at Estação do Aeroporto 2018.07 - Construction unit is inspecting the installation of guide rail and power rail on the viaduct at Avenida do Aeroporto 2018.07 - The suitation of the viaduct at Estação Leste do Cotai 2018.07 - Construction unit is inspecting the system installation on the viaduct at Avenida da Nave Desportiva 2018.07 - Construction unit is inspecting the installation of the system on the viaduct at Estação dos Jogos da Ásia Oriental (in front of the East Asian Games Station) 2018.07 - Contruction unit monitors the electricity system on the viaduct at Avenida da Nave Desportiva 2018.07 - Access control gates of Cotai West Stations have been installed 2018.07 - Construction unit is checking the platform screen door at Pai Kok Station 2018.07 - Construction at concourse of the Stadium Station 2018.07 - Construction unit is checking the engine room in Jockey Club Stations 2018.07 - Equipment installation in Ocean Stations engine room has been completed 2018.06 - The construction unit is testing the signaling system in the engine room 2018.07 - The construction unit is monitoring the test conditions of trains in the backup control center 2018.07 - Some trains have been delivered to depot 2018.07 - The construction unit is testing the emergancy system in the carriage 2018.07 - Some trains have been delivered to depot 2018.07 - Dynamic tests will be carried out after the trains are delivered to the depot 2018.06 - Installation of metal armatures of diaphragm wall 2018.06 - The construction of stabling yard platform at depot has been completed 2018.06 - Some trains are parked in the workshop and maintenance area of depot and waiting for the tests 2018.06 - Installation the access control gates in Taipa Ferry Terminal Station 2018.06 - The construction unit is installing cables in the platform of MUST Station 2018.06 - Some trains are parked on the viaduct at Estr. Flor de Lótus 2018.06 - Footbridge at Lotus Checkpoint Station 2018.05 – Access control gates installation in Pai Kok Station is completed 2018.06 - Train is parked on the platform of Pai Kok Station 2018.06 - Train dynamic test at the Stadium Station 2018.06 - The construction unit is testing the platform screen door at night 2018.06 - Construction at platform of the Ocean Station 2018.06 - Traffic lights of trains are being tested at the workshop and maintenance area of depot 2018.05 – The construction unit is checking the platform screen door at Cotai West Station 2018.05 - Decoration works at Stadium Station 2018.04 - The roads in Lotus Checkpoint Station are reinstated 2018.04 - The roads in Lotus Checkpoint Station are reinstated