Privacy Statement

Handling of personal information
Personal information needs to be provided prior accessing for some of the electronic service of our website. The items of provided information depend on the requirement of the service. Being the coordinating agency, the Housing Bureau ensures that the staff will abide by the stipulation of the law of Macao SAR related to the security of personal information in handling the relevant information.

Handling of non-personal information
When you browse our website, our computer system may log down and keep the information from your browser, such as your IP address, access date and time. The purpose of collecting this information is for internal record. No investigation based on the information will be launched against users unless the website is found maliciously attacked by these visitors.

Hyperlinks to External Website
The website of GIT out-links to other websites of the Macao SAR Government department or other agencies. The contents of these websites are established and protected by the related agencies. GIT only provides the users with hyperlinks in the form of additional service. Clicking hyperlinks that point to other websites means you have left the website of GIT. Hence, you will not be restricted by the terms of use of this website. The terms of use and privacy of these websites may be different from those of this website; therefore you are advised to check the related terms of these websites when necessary. We do not take any responsibility or compensate for the consequence caused by using these websites.

Changes of the terms
The revised Terms of Privacy will be posted without any prior notice if changes are made. The revising date will be printed in the page.

 

 

2018.07 - Foundation work are being started at part of Estrada Flor de Lótus 2018.07 - Some large-scale machines entry the Rotunda Flor de Lótus for the preliminary work of the Seac Pai Van Line 2018.07 - Installation of metal armatures of diaphragm wall 2018.07 - Repairing the structual part in the north ramp 2018.07 - Installation of the temporary structure supports on the ground floor 2018.07 - Construction unit is pouring concrete for spiral ramp 2018.07 - Construction unit is inspecting the suitation of power rail on the viaduct at depot 2018.07 - System installation of train wash equipment at depot 2018.07 - The contruction of the depot engine room is in gradual progress 2018.07 - Cable installation of engine room in depot building 2018.07 - Construction unit is inspecting the suitation of power rail on the viaduct at Estrada de Pac On 2018.07 - Construction unit is adjusting the detailed location of the system equipment on the viaduct along Avenida Wai Long 2018.07 - Construction unit is adjusting the system of ticket vending machine in Airport Station 2018.07- Cable installation on the viaduct at Estação do Aeroporto 2018.07 - Construction unit is inspecting the installation of guide rail and power rail on the viaduct at Avenida do Aeroporto 2018.07 - The suitation of the viaduct at Estação Leste do Cotai 2018.07 - Construction unit is inspecting the system installation on the viaduct at Avenida da Nave Desportiva 2018.07 - Construction unit is inspecting the installation of the system on the viaduct at Estação dos Jogos da Ásia Oriental (in front of the East Asian Games Station) 2018.07 - Contruction unit monitors the electricity system on the viaduct at Avenida da Nave Desportiva 2018.07 - Access control gates of Cotai West Stations have been installed 2018.07 - Construction unit is checking the platform screen door at Pai Kok Station 2018.07 - Construction at concourse of the Stadium Station 2018.07 - Construction unit is checking the engine room in Jockey Club Stations 2018.07 - Equipment installation in Ocean Stations engine room has been completed 2018.06 - The construction unit is testing the signaling system in the engine room 2018.07 - The construction unit is monitoring the test conditions of trains in the backup control center 2018.07 - Some trains have been delivered to depot 2018.07 - The construction unit is testing the emergancy system in the carriage 2018.07 - Some trains have been delivered to depot 2018.07 - Dynamic tests will be carried out after the trains are delivered to the depot 2018.06 - Installation of metal armatures of diaphragm wall 2018.06 - The construction of stabling yard platform at depot has been completed 2018.06 - Some trains are parked in the workshop and maintenance area of depot and waiting for the tests 2018.06 - Installation the access control gates in Taipa Ferry Terminal Station 2018.06 - The construction unit is installing cables in the platform of MUST Station 2018.06 - Some trains are parked on the viaduct at Estr. Flor de Lótus 2018.06 - Footbridge at Lotus Checkpoint Station 2018.05 – Access control gates installation in Pai Kok Station is completed 2018.06 - Train is parked on the platform of Pai Kok Station 2018.06 - Train dynamic test at the Stadium Station 2018.06 - The construction unit is testing the platform screen door at night 2018.06 - Construction at platform of the Ocean Station 2018.06 - Traffic lights of trains are being tested at the workshop and maintenance area of depot 2018.05 – The construction unit is checking the platform screen door at Cotai West Station 2018.05 - Decoration works at Stadium Station 2018.04 - The roads in Lotus Checkpoint Station are reinstated 2018.04 - The roads in Lotus Checkpoint Station are reinstated