One Minute's LRT
The Macao Light Rapid Transit System (LRT) is the first railway transport project of Macao. The works area is vast and technology content is high with the using of various construction methods and complicated coordination among different parts of the construction. Therefore, the Transportation Infrastructure Office (GIT) mounted a special production of the video “One Minute’s LRT” with a view to making the information of LRT construction works easily comprehensible to enable the public to have understating of the Macao LRT system from different angles.

Only Chinese voice-over narration and Chinese/Portuguese subtitles are available on these videos.

Introduction to the platform screen doors system of LRT stations (Chinese subtitles only)
Published in:2018/08
Induction of the first phase of the dramatic test of Light Rail trains (Chinese subtitles only)
Published in:2018/06
The construction of the power rail on the LRT viaducts (Chinese subtitles only)
Published in:2018/04
Preparations for the transport of the first LRT train (Chinese subtitles only)
Published in:2018/02
Installation of the guidance system on the LRT viaducts (Chinese subtitles only)
Published in:2017/12
Introduction of the LRT's heart – construction of the depot (Chinese subtitles only)
Published in:2017/10
Introduction of LRT train bases (Chinese subtitles only)
Published in:2017/08
Introduction of noise barrier and visual barrier of viaduct (Chinese subtitles only)
Published in:2017/06
Introduction of LRT footbridge (Chinese subtitles only)
Published in:2017/04
Civil works of LRT reaching completion phase (Chinese subtitles only)
Published in:2017/01
Introduction of difficulty of hoisting installation at Rotunda do Estádio (Chinese subtitles only)
Published in:2016/12
Introduction of advantages of viaduct prestressing (Chinese subtitles only)
Published in:2016/09
Introduction of height design considerations of LRT viaduct (Chinese subtitles only)
Published in:2016/07
Introduction of construction difficulty of airport restricted area (Chinese subtitles only)
Published in:2016/05
Introduction of construction difficulty of cross highway (Chinese subtitles only)
Published in:2016/04
Introduction of preliminary works before road reopening (Chinese subtitles only)
Published in:2016/03
Introduction of viaduct protection wall (Chinese subtitles only)
Published in:2016/02
Construction of steel structure of station (Chinese subtitles only)
Published in:2016/01
Introduction of double-column piers of LRT (Chinese subtitles only)
Published in:2015/12
Second-time transport of precast parts (Chinese subtitles only)
Published in:2015/11
Introduction of preliminary arrangements for airport flyover (Chinese subtitles only)
Published in:2015/10
Introduction of balanced cantilever hoisting installation (Chinese subtitles only)
Published in:2015/09
Brief introduction of viaduct gantry (Chinese subtitles only)
Published in:2015/08
Brief introduction of viaduct box beam (Chinese subtitles only)
Published in:2015/07
Introduction of environmental monitoring (Chinese subtitles only)
Published in:2015/06
Brief introduction of truss-type hoisting installation (Chinese subtitles only)
Published in:2015/05
Scene of station construction (Chinese subtitles only)
Published in:2015/04
Preparation for station construction (Chinese subtitles only)
Published in:2015/03
Demolition of airport footbridge (Chinese subtitles only)
Published in:2015/02
Construction of entry station of LRT Taipa Line (Chinese subtitles only)
Published in:2015/01
Construction of underground carpark at Lotus checkpoint (Chinese subtitles only)
Published in:2014/12
Introduction of precast parts production (Chinese subtitles only)
Published in:2014/11
Introduction of bridge-type hoisting installation (Chinese subtitles only)
Published in:2014/10
Brief introduction of construction of pier beam top (Chinese subtitles only)
Published in:2014/09
Introduction of monitoring point at Estrada Governador Albano de Oliveira (Chinese subtitles only)
Published in:2014/08
Brief introduction of bridge erecting machines (Chinese subtitles only)
Published in:2014/07
Introduction of train production and testing (Chinese subtitles only)
Published in:2014/05
Brief introduction to functions of pile cap (Chinese subtitles only)
Published in:2014/04
Introduction of pipeline migration (Chinese subtitles only)
Published in:2014/03
Construction highlights of pile foundation (Chinese subtitles only)
Published in:2014/02
Construction steps of pile foundation (Chinese subtitles only)
Published in:2014/01
Overview of LRT Taipa Line (Chinese subtitles only)
Published in:2013/12

 

 

2018.07 - Foundation work are being started at part of Estrada Flor de Lótus 2018.07 - Some large-scale machines entry the Rotunda Flor de Lótus for the preliminary work of the Seac Pai Van Line 2018.07 - Installation of metal armatures of diaphragm wall 2018.07 - Repairing the structual part in the north ramp 2018.07 - Installation of the temporary structure supports on the ground floor 2018.07 - Construction unit is pouring concrete for spiral ramp 2018.07 - Construction unit is inspecting the suitation of power rail on the viaduct at depot 2018.07 - System installation of train wash equipment at depot 2018.07 - The contruction of the depot engine room is in gradual progress 2018.07 - Cable installation of engine room in depot building 2018.07 - Construction unit is inspecting the suitation of power rail on the viaduct at Estrada de Pac On 2018.07 - Construction unit is adjusting the detailed location of the system equipment on the viaduct along Avenida Wai Long 2018.07 - Construction unit is adjusting the system of ticket vending machine in Airport Station 2018.07- Cable installation on the viaduct at Estação do Aeroporto 2018.07 - Construction unit is inspecting the installation of guide rail and power rail on the viaduct at Avenida do Aeroporto 2018.07 - The suitation of the viaduct at Estação Leste do Cotai 2018.07 - Construction unit is inspecting the system installation on the viaduct at Avenida da Nave Desportiva 2018.07 - Construction unit is inspecting the installation of the system on the viaduct at Estação dos Jogos da Ásia Oriental (in front of the East Asian Games Station) 2018.07 - Contruction unit monitors the electricity system on the viaduct at Avenida da Nave Desportiva 2018.07 - Access control gates of Cotai West Stations have been installed 2018.07 - Construction unit is checking the platform screen door at Pai Kok Station 2018.07 - Construction at concourse of the Stadium Station 2018.07 - Construction unit is checking the engine room in Jockey Club Stations 2018.07 - Equipment installation in Ocean Stations engine room has been completed 2018.06 - The construction unit is testing the signaling system in the engine room 2018.07 - The construction unit is monitoring the test conditions of trains in the backup control center 2018.07 - Some trains have been delivered to depot 2018.07 - The construction unit is testing the emergancy system in the carriage 2018.07 - Some trains have been delivered to depot 2018.07 - Dynamic tests will be carried out after the trains are delivered to the depot 2018.06 - Installation of metal armatures of diaphragm wall 2018.06 - The construction of stabling yard platform at depot has been completed 2018.06 - Some trains are parked in the workshop and maintenance area of depot and waiting for the tests 2018.06 - Installation the access control gates in Taipa Ferry Terminal Station 2018.06 - The construction unit is installing cables in the platform of MUST Station 2018.06 - Some trains are parked on the viaduct at Estr. Flor de Lótus 2018.06 - Footbridge at Lotus Checkpoint Station 2018.05 – Access control gates installation in Pai Kok Station is completed 2018.06 - Train is parked on the platform of Pai Kok Station 2018.06 - Train dynamic test at the Stadium Station 2018.06 - The construction unit is testing the platform screen door at night 2018.06 - Construction at platform of the Ocean Station 2018.06 - Traffic lights of trains are being tested at the workshop and maintenance area of depot 2018.05 – The construction unit is checking the platform screen door at Cotai West Station 2018.05 - Decoration works at Stadium Station 2018.04 - The roads in Lotus Checkpoint Station are reinstated 2018.04 - The roads in Lotus Checkpoint Station are reinstated