One Minute's LRT
The Macao Light Rapid Transit System (LRT) is the first railway transport project of Macao. The works area is vast and technology content is high with the using of various construction methods and complicated coordination among different parts of the construction. Therefore, the Transportation Infrastructure Office (GIT) mounted a special production of the video “One Minute’s LRT” with a view to making the information of LRT construction works easily comprehensible to enable the public to have understating of the Macao LRT system from different angles.

Only Chinese voice-over narration and Chinese/Portuguese subtitles are available on these videos.

Installation of the guidance system on the LRT viaducts (Chinese subtitles only)
Published in:2017/12
Introduction of the LRT's heart – construction of the depot (Chinese subtitles only)
Published in:2017/10
Introduction of LRT train bases (Chinese subtitles only)
Published in:2017/08
Introduction of noise barrier and visual barrier of viaduct (Chinese subtitles only)
Published in:2017/06
Introduction of LRT footbridge (Chinese subtitles only)
Published in:2017/04
Civil works of LRT reaching completion phase (Chinese subtitles only)
Published in:2017/01
Introduction of difficulty of hoisting installation at Rotunda do Estádio (Chinese subtitles only)
Published in:2016/12
Introduction of advantages of viaduct prestressing (Chinese subtitles only)
Published in:2016/09
Introduction of height design considerations of LRT viaduct (Chinese subtitles only)
Published in:2016/07
Introduction of construction difficulty of airport restricted area (Chinese subtitles only)
Published in:2016/05
Introduction of construction difficulty of cross highway (Chinese subtitles only)
Published in:2016/04
Introduction of preliminary works before road reopening (Chinese subtitles only)
Published in:2016/03
Introduction of viaduct protection wall (Chinese subtitles only)
Published in:2016/02
Construction of steel structure of station (Chinese subtitles only)
Published in:2016/01
Introduction of double-column piers of LRT (Chinese subtitles only)
Published in:2015/12
Second-time transport of precast parts (Chinese subtitles only)
Published in:2015/11
Introduction of preliminary arrangements for airport flyover (Chinese subtitles only)
Published in:2015/10
Introduction of balanced cantilever hoisting installation (Chinese subtitles only)
Published in:2015/09
Brief introduction of viaduct gantry (Chinese subtitles only)
Published in:2015/08
Brief introduction of viaduct box beam (Chinese subtitles only)
Published in:2015/07
Introduction of environmental monitoring (Chinese subtitles only)
Published in:2015/06
Brief introduction of truss-type hoisting installation (Chinese subtitles only)
Published in:2015/05
Scene of station construction (Chinese subtitles only)
Published in:2015/04
Preparation for station construction (Chinese subtitles only)
Published in:2015/03
Demolition of airport footbridge (Chinese subtitles only)
Published in:2015/02
Construction of entry station of LRT Taipa Line (Chinese subtitles only)
Published in:2015/01
Construction of underground carpark at Lotus checkpoint (Chinese subtitles only)
Published in:2014/12
Introduction of precast parts production (Chinese subtitles only)
Published in:2014/11
Introduction of bridge-type hoisting installation (Chinese subtitles only)
Published in:2014/10
Brief introduction of construction of pier beam top (Chinese subtitles only)
Published in:2014/09
Introduction of monitoring point at Estrada Governador Albano de Oliveira (Chinese subtitles only)
Published in:2014/08
Brief introduction of bridge erecting machines (Chinese subtitles only)
Published in:2014/07
Introduction of train production and testing (Chinese subtitles only)
Published in:2014/05
Brief introduction to functions of pile cap (Chinese subtitles only)
Published in:2014/04
Introduction of pipeline migration (Chinese subtitles only)
Published in:2014/03
Construction highlights of pile foundation (Chinese subtitles only)
Published in:2014/02
Construction steps of pile foundation (Chinese subtitles only)
Published in:2014/01
Overview of LRT Taipa Line (Chinese subtitles only)
Published in:2013/12

 

 

2017.12- A section of the viaduct near Estrada de Pac On 2017.12- The steel fixing part of running pinth has been completed at the Airport restricted area 2017.12- The situation of the platform at Airport station 2017.12- The running plinth on the viaduct is being constructed 2017.12- The running plinth on the viaduct is being constructed 2017.12- The steel fixing part of running pinth has been completed at the Avenida do Aeroporto 2017.12- The construction unit is installing the hand rail on the viaduct at Avenida do Aeroporto 2017.12- The construction unit is installing the power rail on the viaduct 2017.12- The construction unit is installing the power rail on the viaduct 2017.12- The construction unit is installing the power rail on the viaduct 2017.12- The construction unit is installing the equipment on the viaduct at Avenida da Nave Desportiva 2017.12- Construction inside the Loutus station 2017.12- The situation of equipment installation on the viaduct at Estrada Flor de Lótus 2017.12- Continuous viaduct construction at Avenida Cidade Nova 2017.12- The construction unit is inspecting and adjusting the detailed location of the system equipment on the viaduct 2017.12- Construction workers are workingon the viaduct 2017.12- The construction unit is installing the cable trench on the viaduct at Estrada da Baía de Nossa Senhora de Esperança 2017.12- The construction unit is transporting the materials on the viaduct 2017.12- The construction unit is installing the cable trench on the viaduct 2017.12- The viaduct construction progress at Avenida do Estádio 2017.12- The construction unit is installing the power rail on the viaduct at Estrada Governador Albano de Oliveira 2017.12- The construction unit is installing cables on the viaduct at Avenida dos Jogos da Ásia Oriental 2017.12- The construction of the guide rail and power rail at Avenida dos Jogos da Ásia Oriental are completed 2017.12- Governador Albano de Oliveira (Front of the Macao Jockey Club) has resumed the car lanes 2017.12- Avenida da Nave Desportiva (near the Macao Grand Hyatt hotel side) has resumed the car lanes 2017.12- The workshop and maintenance area of depot is being constructed 2017.12- The outline of depot stabling yard 2017.12 - The running plinth construction at the depot stabling yard 2017.12-The cable installation inside depot main building 2017.12- The construction unit is checking the installation situation of the equipment on the viaduct 2017.12- Some trains are parked on the railway at the Sai Van bridge (to Taipa direction) 2017.12- The construction unit is installing cables on the viaduct at Avenida dos Jogos da asia Oriental 2017.10 – The construction unit is installing device cables on the deck of the viaduct near Avenida. dos Jogos da asia Oriental 2017.11 – A train carriage in the “Ocean Station” 2017.11- The train on the railway at the “Ocean Station”