LRT ZONE Family
Issue 30 (Published on 28/11/2016)
 
Issue 29 (Published on 14/11/2016)
 
Issue 28 (Published on 31/10/2016)
 
Issue 27 (Published on 17/10/2016)
 
Issue 26 (Published on 03/10/2016)
 
Issue 25 (Published on 19/09/2016)
 
Issue 24 (Published on 05/09/2016)
 
Issue 23 (Published on 22/08/2016)
 
Issue 22 (Published on 08/08/2016)
 
Issue 21 (Published on 25/07/2016)
 
Issue 20 (Published on 11/07/2016)
 
Issue 19 (Published on 27/06/2016)
 
Issue 18 (Published on 13/06/2016)
 
Issue 17 (Published on 30/05/2016)
 
Issue 16 (Published on 16/05/2016)
 
Issue 15 (Published on 12/05/2016)
 
Issue 14 (Published on 18/04/2016)
 
Issue 13 (Published on 04/04/2016)
 
Issue 12 (Published on 21/03/2016)
 
Issue 11 (Published on 07/03/2016)
 
Issue 10 (Published on 12/05/2014)
 
Issue 9 (Published on 28/04/2014)
 
Issue 8 (Published on 14/04/2014)
 
Issue 7 (Published on 31/03/2014)
 
Issue 6 (Published on 17/03/2014)
 
Issue 5 (Published on 03/03/2014)
 
Issue 4 (Published on 17/02/2014)
 
Issue 3 (Published on 30/01/2014)
 
Issue 2 (Published on 20/01/2014)
 
Issue 1 (Published on 06/01/2014)
 
 

 


2018.07 - Foundation work are being started at part of Estrada Flor de Lótus 2018.07 - Some large-scale machines entry the Rotunda Flor de Lótus for the preliminary work of the Seac Pai Van Line 2018.07 - Installation of metal armatures of diaphragm wall 2018.07 - Repairing the structual part in the north ramp 2018.07 - Installation of the temporary structure supports on the ground floor 2018.07 - Construction unit is pouring concrete for spiral ramp 2018.07 - Construction unit is inspecting the suitation of power rail on the viaduct at depot 2018.07 - System installation of train wash equipment at depot 2018.07 - The contruction of the depot engine room is in gradual progress 2018.07 - Cable installation of engine room in depot building 2018.07 - Construction unit is inspecting the suitation of power rail on the viaduct at Estrada de Pac On 2018.07 - Construction unit is adjusting the detailed location of the system equipment on the viaduct along Avenida Wai Long 2018.07 - Construction unit is adjusting the system of ticket vending machine in Airport Station 2018.07- Cable installation on the viaduct at Estação do Aeroporto 2018.07 - Construction unit is inspecting the installation of guide rail and power rail on the viaduct at Avenida do Aeroporto 2018.07 - The suitation of the viaduct at Estação Leste do Cotai 2018.07 - Construction unit is inspecting the system installation on the viaduct at Avenida da Nave Desportiva 2018.07 - Construction unit is inspecting the installation of the system on the viaduct at Estação dos Jogos da Ásia Oriental (in front of the East Asian Games Station) 2018.07 - Contruction unit monitors the electricity system on the viaduct at Avenida da Nave Desportiva 2018.07 - Access control gates of Cotai West Stations have been installed 2018.07 - Construction unit is checking the platform screen door at Pai Kok Station 2018.07 - Construction at concourse of the Stadium Station 2018.07 - Construction unit is checking the engine room in Jockey Club Stations 2018.07 - Equipment installation in Ocean Stations engine room has been completed 2018.06 - The construction unit is testing the signaling system in the engine room 2018.07 - The construction unit is monitoring the test conditions of trains in the backup control center 2018.07 - Some trains have been delivered to depot 2018.07 - The construction unit is testing the emergancy system in the carriage 2018.07 - Some trains have been delivered to depot 2018.07 - Dynamic tests will be carried out after the trains are delivered to the depot 2018.06 - Installation of metal armatures of diaphragm wall 2018.06 - The construction of stabling yard platform at depot has been completed 2018.06 - Some trains are parked in the workshop and maintenance area of depot and waiting for the tests 2018.06 - Installation the access control gates in Taipa Ferry Terminal Station 2018.06 - The construction unit is installing cables in the platform of MUST Station 2018.06 - Some trains are parked on the viaduct at Estr. Flor de Lótus 2018.06 - Footbridge at Lotus Checkpoint Station 2018.05 – Access control gates installation in Pai Kok Station is completed 2018.06 - Train is parked on the platform of Pai Kok Station 2018.06 - Train dynamic test at the Stadium Station 2018.06 - The construction unit is testing the platform screen door at night 2018.06 - Construction at platform of the Ocean Station 2018.06 - Traffic lights of trains are being tested at the workshop and maintenance area of depot 2018.05 – The construction unit is checking the platform screen door at Cotai West Station 2018.05 - Decoration works at Stadium Station 2018.04 - The roads in Lotus Checkpoint Station are reinstated 2018.04 - The roads in Lotus Checkpoint Station are reinstated